Thornton Primary School asked for our services when they needed one of the school halls replacing with parquet flooring.

We removed the previously installed engineered flooring to find a poor subfloor, Patching and strengthening was needed before any further work could be carried out.

Once levelled and strengthen the 300m2 room was ready for the single herringbone 2-strip boarder installation. Final steps were to sand and seal the room finishing the install with the traditional quadrant edging.

Leave a Reply